Food Waste Biogas Plant, Charlotte, NC, 2018

AQX provided structural engineering services on the 5.4 MW biogas treatment plant including centrifuge building housing three centrifuges and a separate electrical room, slurry tank with chopper pumps and depacking platform for 400 ton/day food waste receiving building. The project included a footing design and seismic anchorage for a new depacking system, dissolved air flotation system, and blower container that house 4-300 HP high speed blower, as well as providing services during construction including responding to RFI’s and providing reviews of shop drawings.

Close Menu